JSC “Sumy Plant” Nasosenergomash “supplied APEA1840-80-2 units for NPP” Rupur “, Bangladesh.

JSC “Sumy Plant“ Nasosenergomash ”manufactured and delivered five sets of APEA1840-80-2 feed pumping units for the first unit of NPP“ Rupur ”, Bangladesh.

This is the first delivery under the contract.

Now there are 10 items in production, which are supposed to be shipped to two units of the Rupur NPP in 2021-2022.

Design by "TriA"